Tender Details
This contract is to design and construct an access way (walkway and stairway system) to the Horizontal Displacement Well on the Blowering dam embankment.
This horizontal displacement well contains dam safety instrumentation, and is located on the downstream slope of the dam embankment. The downstream slope of the dam embankment consists of large rocks, and climbing this surface up to the horizontal displacement well is a hazard.
Location
States and Territories: ACT, NT, QLD, SA, TAS, VIC, WA
RFT Type
Additional Details / Instructions
Please be informed that there will be a mandatory site meeting on 12th September 2012, Wednesday at Blowering Dam. Failure to attend this meeting will result in the tender being passed over. WHS requirements for people attending the mandatory site visit include construction induction training (White Card), high visibility clothing including long sleeve shirt and pants, and safety boots.
Please notify Peter Demeo of your intention to attend, by email, Peter.Demeo@statewater.com.au
Address for Lodgement
eTender
Estimated Timeframe for Delivery
22 Weeks