Tender Details
Burrendong Dam Upgrade: Stage 1B - Spillway Investigations and preparing Concept Design involves:
- Reviewing all the available information and outcomes of previous studies and reports for better appraisal of the issues involved:
- Undertaking following investigations on the spillway and structural equipment to satisfy the PMPDF flows:
- Computational Fluid Dynamics (CFD);
- 3- D Finite Element Structural analysis on radial gates;
- Gate hoist and drive train investigations;
- Geotechnical Investigations;
- Spillway Chute investigations;
- Electrical and controls investigations;
- Recommending procurement Strategy;
- Detailed Cost estimates;
and
- Producing a detailed Concept Design and drawings for the preferred option for increasing the spillway capacity to handle extreme floods (PMPDF flow);
The RFT Preview Document must be completed and submitted to obtain the passcode prior to download of the RFT documents.
Location
States and Territories: ACT, NT, QLD, SA, TAS, VIC, WA
RFT Type
RFT Preview Document(s)
Conditions for Participation
The tenderers must commit to State Water's delivery program for this engagement.
Estimated Timeframe for Delivery
16 Weeks from Letter of Award