The capital works that will be necessary include:
Wyong River Off-take Structure |
A new river off-take, near the site of the existing structure, capable of extracting up to 500ML/day from the lower Wyong River. This will be a reinforced concrete structure, with coarse screens, located in the river bank. |
Wyong River Pumping Station |
A new in-ground submersible pumping station (nominally 12m in diameter) to extract water through the Wyong River Off-take Structure, and to transfer it, via the Wyong - Mardi Rising Main No 3 to Mardi Dam, with an installed capacity of 320ML/day. |
Wyong - Mardi Rising Main No 3 |
A new rising main, approx 2.1km long and about 1000mm diameter, supplementing two existing rising mains, to transfer water from the Wyong River Pumping Station to Mardi Dam (via the Wyong - Mardi Inlet. The majority of the route will be through private property but there will be the need to cross the Old Maitland Road once and also to traverse a limited amount of Council property. Construction will be by open trenching and will involve one pipe bridge. |
Wyong - Mardi Inlet |
A new inlet to Mardi Dam to take the flow from both the Wyong-Mardi Rising Main No 3 and from the Mardi - Mangrove Transfer Main. The inlet will include a breaktank and a diffuser structure. |
Mardi - Mangrove Transfer Pumping Station |
A new pumping station to pump water from Mardi Dam, through the Mardi - Mangrove Transfer Main and the existing Boomerang Creek Tunnel, to Mangrove Creek Dam at a rate of up to 120ML/day. It will be located in the vicinity of Mardi Dam and will be above-ground and contained within a new building. |
Mardi - Mangrove Transfer Main |
A new pipeline, approx 19km long and about 1000mm diameter, linking Mardi Dam with the end of the existing Boomerang Creek Tunnel (which leads to Mangrove Creek Dam). It will permit flow in either direction according to operational needs. The majority of the pipeline will be in private property and constructed using open trenching. However, there will be sections of the route where construction will take place in the road reserve of the Yarramalong Road and there will be a number of river crossings. |
Boomerang Creek Inlet/Outlet Structure |
Modifications to the existing structure in the Boomerang Creek arm of Mangrove Creek Dam to enable it to operate as an inlet / outlet structure. Depending on dam storage levels, this could involve underwater work. |
Lower Wyong River Weir, Fishway and Gauging |
Modifications to the existing weir and fishway (downstream of the Wyong River Off-Take Structure) to incorporate a low-flow fishway and improved flow measurement capability. |
Location
RFT Type
RFT Preview Document(s)
Related Web Site Address
Tender Respondents
Business Name | Trading Name | Address |
---|---|---|
Abergeldie Contractors | - | 5 George Young Street Regents Park NSW 2143 AUSTRALIA |
Abigroup Contractors Pty Ltd | Abigroup Contractors Pty Ltd | 924 Pacific Hwy Gordon NSW 2072 AUSTRALIA |
AJ Lucas Group Limited | - | 394 Lane Cove Road Macquarie Park NSW 2113 AUSTRALIA |
Arogen | Arogen Pty Ltd | 114 Mitchell Avenue Kurri Kurri NSW 2327 AUSTRALIA |
Arogen | Arogen Pty Ltd | 114 Mitchell Avenue Kurri Kurri NSW 2327 AUSTRALIA |
Baulderstone Pty Ltd | - | Level 4, 39 Delhi Road North Ryde NSW 2113 AUSTRALIA |
billbergia group | - | Level 2 25 Angas Street Meadowbank NSW 2114 AUSTRALIA |
BMD Group | BMD | 3 The Crescent Homebush Bay NSW 2127 AUSTRALIA |
Bovis Lend Lease | Bovis Lend Lease | 30 Hickson road millers point NSW 2000 AUSTRALIA |
Fulton Hogan Pty Ltd | - | level 3 61 Dunning Ave Rosebery NSW 2018 AUSTRALIA |
Jemena Asset Management | as above | 100 Bennelong Parkway, Sydney Olympic Park, Hoembush NSW 2127 AUSTRALIA |
John Holland Water | - | Lvl 6, 235 Pyrmont St PYRMONT NSW 2009 AUSTRALIA |
McConnell Dowell Constructors (Aust) Pty Ltd | - | Level 7, Tower B, 799 Pacific Highway Chatswood NSW 2067 AUSTRALIA |
Reed Constructions Australia Pty Ltd | The Reed Group | 41 McLaren St North Sydney NSW 2060 AUSTRALIA |
RIG Installations (Newcastle) Pty Ltd | - | Lot 4 Cormorant Rd Kooragang NSW 2304 AUSTRALIA |
Setlow Constructions | - | 167 Quinns Hill Rd East Stapytlon QLD 4207 AUSTRALIA |
Setlow Constructions | - | 167 Quinns Hill Rd East Stapytlon QLD 4207 AUSTRALIA |
Setlow Constructions | - | 167 Quinns Hill Rd East Stapytlon QLD 4207 AUSTRALIA |
Setlow Constructions | - | 167 Quinns Hill Rd East Stapytlon QLD 4207 AUSTRALIA |
WDS Limited | WDS Infrastructure and Services | Level 10, 2 Elizabeth Plaza North Sydney Sydney NSW 2060 AUSTRALIA |
Additional Details / Instructions
All queries in writing to email: mardimangrovelink@wyong.nsw.gov.au
Electronic Lodgement is preferred
Address for Lodgement
Conditions for Participation
The National Code of Practice for the Construction Industry, in accordance with the Australian Government Implementation Guidelines for the National Code of Practice for the Construction Industry, reissued June 2006, applies to this project.
Entities contracted to undertake the building and construction work under this Project must be accredited under the Australian Government Building and Construction OHS Accreditation Scheme, established by the Building and Construction Industry Improvement Act 2005.