Simple keyword search and advanced search
close
or

Central Coast Council / Expression of Interest for Construction of the Mardi Mangrove Link Project - NSW Central Coast - CPA/159131

RFT ID CPA/159131
RFT Type Expression of Interest for Specific Contracts
Published 9-Jul-2009
Closes 30-Jul-2009 2:00pm
Category Pipeline
Agency Central Coast Council


Contact Person
Mr. Mick Lalic
Phone: (02) 4350 1676
mardimangrovelink@wyong.nsw.gov.au

Tender Details

The Mardi-Mangrove Link Project Capital Works

The capital works that will be necessary include:

Wyong River Off-take Structure

A new river off-take, near the site of the existing structure, capable of extracting up to 500ML/day from the lower Wyong River.  This will be a reinforced concrete structure, with coarse screens, located in the river bank.

Wyong River Pumping Station

A new in-ground submersible pumping station (nominally 12m in diameter) to extract water through the Wyong River Off-take Structure, and to transfer it, via the Wyong - Mardi Rising Main No 3 to Mardi Dam, with an installed capacity of 320ML/day.

Wyong - Mardi Rising Main No 3

A new rising main, approx 2.1km long and about 1000mm diameter, supplementing two existing rising mains, to transfer water from the Wyong River Pumping Station to Mardi Dam (via the Wyong - Mardi Inlet.  The majority of the route will be through private property but there will be the need to cross the Old Maitland Road once and also to traverse a limited amount of Council property.  Construction will be by open trenching and will involve one pipe bridge.

Wyong - Mardi Inlet

A new inlet to Mardi Dam to take the flow from both the Wyong-Mardi Rising Main No 3 and from the Mardi - Mangrove Transfer Main.  The inlet will include a breaktank and a diffuser structure.

Mardi - Mangrove Transfer Pumping Station

A new pumping station to pump water from Mardi Dam, through the Mardi - Mangrove Transfer Main and the existing Boomerang Creek Tunnel, to Mangrove Creek Dam at a rate of up to 120ML/day. It will be located in the vicinity of Mardi Dam and will be above-ground and contained within a new building.

Mardi - Mangrove Transfer Main

A new pipeline, approx 19km long and about 1000mm diameter, linking Mardi Dam with the end of the existing Boomerang Creek Tunnel (which leads to Mangrove Creek Dam). It will permit flow in either direction according to operational needs.  The majority of the pipeline will be in private property and constructed using open trenching. However, there will be sections of the route where construction will take place in the road reserve of the Yarramalong Road and there will be a number of river crossings.

Boomerang Creek Inlet/Outlet Structure

Modifications to the existing structure in the Boomerang Creek arm of Mangrove Creek Dam to enable it to operate as an inlet / outlet structure.  Depending on dam storage levels, this could involve underwater work.

Lower Wyong River Weir, Fishway and Gauging

Modifications to the existing weir and fishway (downstream of the Wyong River Off-Take Structure) to incorporate a low-flow fishway and improved flow measurement capability.

Location

NSW Regions: Hunter, Sydney

RFT Type

Expression of Interest for Specific Contracts - An invitation for Expression of Interest (EOI) for pre-registration of prospective tenderers for a specific work or service. Applicants are initially evaluated against published selection criteria, and those who best meet the required criteria are invited to Tender (as tender type Pre-Qualified/Invited).

Related Web Site Address


Tender Respondents

Business Name Trading Name Address
Abergeldie Contractors - 5 George Young Street
Regents Park NSW 2143
AUSTRALIA
Abigroup Contractors Pty Ltd Abigroup Contractors Pty Ltd 924 Pacific Hwy
Gordon NSW 2072
AUSTRALIA
AJ Lucas Group Limited - 394 Lane Cove Road
Macquarie Park NSW 2113
AUSTRALIA
Arogen Arogen Pty Ltd 114 Mitchell Avenue
Kurri Kurri NSW 2327
AUSTRALIA
Arogen Arogen Pty Ltd 114 Mitchell Avenue
Kurri Kurri NSW 2327
AUSTRALIA
Baulderstone Pty Ltd - Level 4, 39 Delhi Road
North Ryde NSW 2113
AUSTRALIA
billbergia group - Level 2
25 Angas Street
Meadowbank NSW 2114
AUSTRALIA
BMD Group BMD 3 The Crescent
Homebush Bay NSW 2127
AUSTRALIA
Bovis Lend Lease Bovis Lend Lease 30 Hickson road
millers point NSW 2000
AUSTRALIA
Fulton Hogan Pty Ltd - level 3 61 Dunning Ave
Rosebery NSW 2018
AUSTRALIA
Jemena Asset Management as above 100 Bennelong Parkway,
Sydney Olympic Park,
Hoembush NSW 2127
AUSTRALIA
John Holland Water - Lvl 6, 235 Pyrmont St
PYRMONT NSW 2009
AUSTRALIA
McConnell Dowell Constructors (Aust) Pty Ltd - Level 7, Tower B, 799 Pacific Highway
Chatswood NSW 2067
AUSTRALIA
Reed Constructions Australia Pty Ltd The Reed Group 41 McLaren St
North Sydney NSW 2060
AUSTRALIA
RIG Installations (Newcastle) Pty Ltd - Lot 4 Cormorant Rd
Kooragang NSW 2304
AUSTRALIA
Setlow Constructions - 167
Quinns Hill Rd East
Stapytlon QLD 4207
AUSTRALIA
Setlow Constructions - 167
Quinns Hill Rd East
Stapytlon QLD 4207
AUSTRALIA
Setlow Constructions - 167
Quinns Hill Rd East
Stapytlon QLD 4207
AUSTRALIA
Setlow Constructions - 167
Quinns Hill Rd East
Stapytlon QLD 4207
AUSTRALIA
WDS Limited WDS Infrastructure and Services Level 10, 2 Elizabeth Plaza
North Sydney
Sydney NSW 2060
AUSTRALIA

Additional Details / Instructions

All queries in writing to email: mardimangrovelink@wyong.nsw.gov.au

 

Electronic Lodgement is preferred

 

 

Address for Lodgement

FOR ALL LODGEMENT DETAILS. REFER TO 6.7 "Lodgement of Expressions of Interest"

Conditions for Participation

The National Code of Practice for the Construction Industry, in accordance with the Australian Government Implementation Guidelines for the National Code of Practice for the Construction Industry, reissued June 2006, applies to this project.

 

Entities contracted to undertake the building and construction work under this Project must be accredited under the Australian Government Building and Construction OHS Accreditation Scheme, established by the Building and Construction Industry Improvement Act 2005.