Tender Details
The Consultant will be required to prepare Review of Environmental Factors (REF), review the existing reports relating to flood events and their effects on the airport and surrounding areas; review the stormwater management concept design prepared by Storm Consulting in 2010; review the engineering survey; carry out a Geotechnical investigation of the airport runway pavement and subgrade and the surrounding areas; undertake the design of a system to manage groundwater and stormwater runoff on and adjacent to the airport; provide a design for surface and subsoil drainage within the airport runway area including taxi ways, thresholds etc with emphasis on prevention of the “bubbling” and/or lifting of the runway pavement sealing; provide a pavement design of the runway to satisfy the stormwater runoff issues and one suitable to accept the loading of the nominated aircraft; provide a design report which clearly demonstrates in tabular form how the design work meets this specification and the requirements of the relevant Australian Standards, QantasLink, CASA and Air Services Australia.
Location
Estimated Value
RFT Type
Related Records
- Contract Award Notices:
- LHIB 2014-12 GHD Pty Ltd
Additional Details / Instructions
No site meeting required.