Tender Details
OEH requires a suitably qualified and experienced contractor or contractors to undertake the design, materials supply and installation of steel walkway structures in Kosciuszko National Park at two locations:
- Design and Construction of approximately 1,740 lineal metres of new walkway platform at Mt Lee, Kosciuszko National Park including connecting new sections of platform to the existing walking track to create a realignment of the Main Range Walk that avoids threatened Windswept Feldmark plant habitat. Redundant walkways to be removed.
- Construction of 650 lineal metres of new walkway platform to supplied specifications on the existing Kosciuszko Walk (between Eagles Nest and Rawsons Pass), to bypass existing steps and dilapidated sections, and improve wheelchair access, emergency vehicle use and reduce impacts to surrounding vegetation. This work also includes the removal of redundant sections following completion of the new walkway platform and connection to the existing platform.
For further information please refer to the GC21 Documents
Location
Refer to Additional Details / Instructions
RFT Type
Additional Details / Instructions
Pre-tender meeting
A pre-tender meeting will be held on the date, at the time and at the place nominated in the advertisement. Attendance is not mandatory, however is highly recommended for all Tenderers either in-person, at the address below, or via teleconference, details to be provided upon request.
National Parks and Wildlife, Southern Ranges Branch Tender Briefing: 9.30 am Thursday 6th September 2018
49 Jindabyne Road, Jindabyne, 2627
The Contact Person will be available at that time to answer any tenderer’s queries regarding the tender. Attendance in-person or via the videoconference provided by the Principal at the Pre-tender meeting is not mandatory. Tenders submitted by tenderers who fail to attend be passed over.
- Please refer to the GC21 Documents