Tender Details
1.1.1 The contract work shall be in accordance with the construction plans and relevant specifications including, but not limited to:
a) Restoration of all disturbed areas.
b) Prepare and submit for approval a Sediment Control plan and install sediment control measures as proposed, maintain during construction and remove on completion of the works.
c) Supply and installation of 1.8m cyclone mesh fence in order to completely barricade the site.
d) Locate all services on site prior to the commencement of any work on site. A copy of the services diagram including the location and levels must be submitted to the supervising Engineer.
e) Submit Project Management Plan including Safe Work Method Statement (SWM) for the works, project specific requirements, sub-contractors and suppliers details, Occupational Health & Safety information, Environmental Management etc; The Safe Work Method Statement must be submitted prior to the commencement of any construction work on site. The SWM must identify potential hazards, hazard control measures, level of risk of all individual work items, the type of risks, proposed risk management etc; In addition to the above, the contractor must submit a soil and water management plan prior to the commencement of any construction work on site.
Excavate for the new alignment, backfill and compact as per the design and remove all excess spoil from the site including topsoil.
Rockwork for Riffles, low flow channel, pool to low flow channel etc;
Construction of a bio-retention system
Sewer encasement for the two sewer lines.
Removal of all excavated materials from the site
Not:e: Landscaping works do not form part of this contract and will be carried out by a specialist landscape contractor. The civil contractor is to note that the landscaping works may commence prior to the completion of the civil works on site,