Tender Details
The Mullumbimby Water Mains Extension project is to upgrade the existing undersized emergency water supply pipeline to ensure a secure, safe water supply that improves the resilience of supply during future adverse weather events.
The project objective is to deliver a reliable correctly sized water source connected to the existing Rous Water Supply Network. The works include but are not limited to the following;
• As can be reasonably determined from the specification, appendices and drawings.
• New dedicated DN400 HDPE water main within the road reserve of Tandy’s Lane between Pacific Highway and Gulgan Road.
• New dedicated DN400 HDPE water main within the road reserve from Mullumbimby Road/Manns Road to Azalea Street Reservoirs.
• Pipeline installation at Azalea Street reservoir site.
• Minor water main upgrades at Left Bank Road/Tristran Road intersection, including DN150 water main and sluice valves.
Location
RFT Type
Additional Details / Instructions
Address for Lodgement
Estimated Timeframe for Delivery
42 weeks.