As part of the Power Supply Upgrade (PSU) Program, Transport for New South Wales (TfNSW) invites Registrations of Interest (ROI) from organisations interested in undertaking the Design & Construction of Ingleburn, Minto and Guildford Substations.
The current proposed design methodology for the construction of Ingleburn, Minto and Guildford substations is "Built Off Site Solution (BOSS)" defined as a building consisting of multiple standardised, independent modules which are integrated on-site.
TfNSW invites tenders from suitably qualified organisations with a track record in delivering BOSS substations, including design development experience and who can demonstrate a detailed knowledge of the appropriate codes, standards and guidelines.
Location
RFT Type
This tender is a Multi Stage or Registration of Interest (ROI) opportunity. The ROI stage does not conclude with Contract Award, only ROI Shortlisting.
Tender Respondents
Business Name | Trading Name | Address | |
---|---|---|---|
* Laing O'Rourke | - | 100 Arthur Street North Sydney NSW 2060 AUSTRALIA |
|
* RCR O'Donnell Griffin | RCR O'Donnell Griffin | Level 39, Bridge St Sydney NSW 2000 AUSTRALIA |
|
Robin Johnson Engineering Pty Ltd | Robin Johnson Engineering Pty Ltd | 115 Morphett Road Morphettville SA 5043 AUSTRALIA |
|
* Tenix Australia Pty Ltd | Tenix Australia Pty Ltd | Level 18 40 Mount Street North Sydney NSW 2060 AUSTRALIA |
|
Transfield Services | - | 110 Pacific Highway North Sydney NSW 2060 AUSTRALIA |
|
* UGL Engineering Pty Ltd | UGL Engineering Pty Ltd | Level 5, 40 Miller Street North Sydney NSW 2018 AUSTRALIA |
|
Zinfra Pty Ltd | - | 8 Solent Circuit Baulkham Hills NSW 2153 AUSTRALIA |
|
* Multi stage tender - short listed entity |
Related Records
- Contract Award Notices:
- TPD-14-4018 Downer Utilities Australia Pty Ltd
Additional Details / Instructions
An ROI briefing will be held at 10.00am on Wednesday, 08 October 2014 at the following venue:
Zenith Centre, Level 6 Tower A, Brunel & Taylor Meeting Rooms
821 Pacific Highway Chatswood NSW 2067
Tenderers will be permitted a maximum of two (2) attendees at the TfNSW ROI briefing. Attendees are required to pre-register by e-mail to the Contact Officer by 3.00pm on Friday, 03 October 2014, providing the names of all attendees.
Prior to the commencement of the ROI briefing, all Applicants will be required to undertake the following:
· complete and sign the ‘TfNSW Confidentiality Undertaking’; and
· sign the attendance register which will be compiled and distributed by the Contact Officer.
Address for Lodgement
Conditions for Participation
To be considered for shortlisting through the ROI process, applicants must comply with and demonstrate that they meet the following minimum requirements in ROI Schedule 2:
Minimum Requirement 1 – The Applicant has achieved a turnover in construction contracting activities greater than $10 million per annum for each of the last 3 years. If the Applicant is a joint venture, this turnover amount is required to apply to at least one Participant.
Minimum Requirement 2 – The Applicant, or the Applicant’s proposed subcontractor, has within the last five years, undertaken no less than two Substation projects. The scope of these projects must have included the management of: design, supply, construction and commissioning.
Minimum Requirement 3 – The Applicant has a Safety Management System that:
- meets the requirements of and the accreditation criteria defined by the Work Health and Safety Act 2011 (NSW) and the Rail Safety National Law 2012 (NSW); and
- will enable the Principal to fulfil its obligations as an accredited Rail Transport Operator under the Rail Safety National Law 2012 (NSW).
Minimum Requirement 4 – The Applicant has an Environmental Management System that has been certified by an appropriately recognised third party as complying with ISO 14001:2004 Environmental Management Systems.
Minimum Requirement 5 – The Applicant has a Quality Management System that has been certified by an appropriately recognised third party as complying with ISO 9001:2008 Quality Management Systems.