"The design and construction of 8 earthen ponds and associated infrastructure for Macquarie Perch production at the Narrandera Fisheries Centre. These ponds are in three different locations on the site and includes;
design, site establishment and dis-establishment, required safety and environment plans, earthworks, excavation of topsoil 300mm deep stripping of existing earth levee embankment batters and stockpile for reuse, stripping and general preparation for new embankment foundation, earthworks construction, new earth embankments, levee topsoil layer of new earth embankments, allowance for additional excavation below foundation level, import suitable material and additional compaction where directed, water drainage, installation of water supply pipes, concrete works, install supplied sumps and connect pipework, excavation for electrical work and site restoration."