Tender Details
Wingecarribee Shire Council is seeking Quotations from appropriately qualified and experienced Contractors to undertake replacement and installation of flow meters at various locations within the Wingecarribee Shire Council water supply infrastructure.
A more detailed brief of the extent of services required by Council is set out in Volume 1 – Specification that has been included as part of the Request for Quotation documentation.
In accordance with Council Policy and Guidelines, Council invites quotations in accordance with this Invitation and the following accompanying documents:
• Volume 1- Specification
o Volume 1a – Flow Meter Specification
o Volume 1b – Flow Meters Location Map
• Volume 2 - Response Schedules
• Volume 3 - Contract (“proposed contract”)
• Any published Addenda
Location
RFT Type
Related Web Site Address
Additional Details / Instructions
A Site Inspection will be held as per the details provided in the table below –
Date |
Time |
Location |
Thursday, 26 April 2018 |
10:00 am |
Water & Sewer Depot - 9 Cavendish St, Mittagong NSW 2575 |
Respondents are requested to attend a Quotation briefing/site inspection. Confirmation of your attendance is requested to Council’s Procurement Branch by email: procurement@wsc.nsw.gov.au no later than 4:00 pm Tuesday, 24 April 2018.
Attendance at this meeting is NOT a mandatory criteria.
Address for Lodgement
Conditions for Participation
Evaluation Criteria
The information required by the respondent in this document will be used to assess Respondents in accordance with pre-established Mandatory Participation Criteria, Non-Cost Criteria, and Cost Criteria.
Mandatory Participation Criteria will be assessed on a Yes/No basis and MUST be met by the Respondent. If a response fails to fully comply with any of the outlined mandatory criteria, may be deemed by Council to be non-conforming and therefore not be eligible to be shortlisted and progress any further in the evaluation.
Non-Cost and cost criteria will be assessed as weighted criterial by the Evaluation Panel for determining an overall value for money assessment from the Respondents submission. Failure to fully comply with non-cost and cost weighted criteria may reduce the Respondent’s overall score but will not result in the exclusion of the Quotation Response from further consideration.