Tender Details
The works include, but are not limited to, the following:
a) Design, supply, install and commission a new Instantaneous Gas Hot Water System for each unit of the building as specified herein.
b) Supply and install all instantaneous gas heaters, gas piping, hot water piping, piping insulation, gas meters, boundary regulators, gas heater cages and gas heater enclosures.
c) Supply and install all brackets, mounting hardware, conduit, ducting and cabling using approved types.
d) Supply and install fire rated vandal proof gas heater enclosures to the stairwells.
e) Supply and install lockable access ladders to each section of the roof
f) Removal of the existing Raypak gas hot water system.
g) All other work required from the Contractor to deliver the fully functional and operational Works at the nominated locations.
h) Commissioning and testing of the Works
i) Provision of operator training
j) Provision of Work as executed or “as-installed” documentation and drawings
k) Provision of maintenance and breakdown services during the defects liability period (DLP).
Location
RFT Type
Tender Respondents
Business Name | Trading Name | Address |
---|---|---|
A W Edwards Pty Ltd | - | 131 Sailors Bay Road Northbridge NSW 2063 AUSTRALIA |
Grateholt Pty Ltd | Grateholt Plumbing | 23 Mary Parade Rydalmere NSW 2116 AUSTRALIA |
JS & B Plumbing Services Pty Ltd | - | Unit B9, 13-15 Forrester Street Kingsgrove NSW 2208 AUSTRALIA |
MP Maintenance Pty Ltd | - | 2/31 Barry Avenue Mortdale NSW 2223 AUSTRALIA |
Address for Lodgement
Conditions for Participation
Only the following selected companies may submit tenders: 1) A W Edwards Pty Ltd 131 Sailors Bay Road Northbridge NSW 2063 2) Grateholt Pty Ltd 23 Mary Parade Rydalmere NSW 2116 3) MP Maintenance Pty Ltd (PM Plumbing) 2/31 Barry Avenue Mortdale NSW 2223 4) JS&B Plumbing Services Pty Ltd Unit B9 13-15 Forrester Street Kingsgrove NSW
Estimated Timeframe for Delivery
7 week construction period
52 week maintenance period