The salient features of Disposal Basin includes:
- Evaporation Basin
- Enhanced Leakage Pond (ELP); and
- Terminal Structure, Check & Culverts and Outlet to ELP.
The principal items of work to be executed under this Contract as described herein and as shown on the drawings, include the following:
§ Foundation preparation and construction of approximately 3.5 km homogeneous external and internal embankments including the Operation and Maintenance (O&M) Access Track on the embankment crest for Evaporation Basin;
§ Excavation of 360 m long at surface level x 50m wide at surface level x 5 m deep below surface level for Enhanced Leakage Pond (the dimensions of ELP are based on a clay layer up to a depth of 4.6m and they are indicative only)
§ Construction of following reinforced concrete structures:
i. One (1) Terminal Structure;
ii. One (1) Check & Culverts; and
iii. Two (2) Outlets to ELP.
§ Supply and delivery of pipes, pipe bedding and protection materials and installation of pipes