Tender Details
Council is seeking quotations from suitably qualified and experienced contractor to undertake Birrong Swimming Pool Car Park
Works under this Contract generally include:
· Demolition of existing car park including removal of base material, existing drive way and concrete foot path panels as shown in the drawing.
· Construction of heavy duty vehicle crossing.
· Construction of bitumen pavement Type 1, 2 and 3.
· Construction of 0.5 meter high keystone block retaining wall.
· Landscaping.
· Sign posting and line marking.
Location
RFT Type
Additional Details / Instructions
Works are anticipated to start on 23 August 2010 with 5 weeks construction duration. Scheduled Practical completion shall be reached by 28 September 2010.